Contact Us

Ramaniyam Real Estates,

14/67, 3rd Main Rd,

Gandhi Nagar, Adyar

Chennai 600 020

+91 4443447500 +91 9710928855 +91 7299922617 sales@ramaniyam.com

Vedha

Adyar

Download Brochure

Download file

Enquire Now

Amenities

Generator Backup
CCTV
Elevators
Rain Water Harvesting

Master Layout Plan

Availability

Flat No. Floor Type Area Facing Layout Availability
4A 4 3BHK + 3T 1795 East Not Available Sold Out
3A 3 3BHK + 3T 1795 East Not Available Sold Out
2A 2 3BHK + 3T 1795 East Not Available Sold Out
5A 5 3BHK + 3T 1795 East Sold Out
1A 1 3BHK + 3T 1795 East Sold Out

Approvals

Planning Permit No:

OL- PP / NHRB / 0084 / 2024

Date of Permit:

2024-03-06

Building Permission No:

CEBA / WDCN13 / 00127 / 2024

Date of Permit:

2024-03-20

Project Update Images

  • Upto 4th floor block work is completed
  • 5th floor block work is in progress. (50% completed)
  • 1st floor gypsum ceiling plastering work is in progress. (30% completed)
  • 1st floor gypsum wall plastering work is in progress.
  • 1st and 2nd floor toilet concealed plumbing work is completed.
  • Upto 4th floor block work is completed
  • 5th floor block work is in progress. (70% completed)
  • 3rd floor gypsum ceiling plastering work is in progress.
  • 1st floor gypsum wall plastering work is in progress. (70% completed)
  • 3rd floor toilet concealed plumbing work is in progress.
  • Upto 4th floor block work is completed
  • 5th floor block work is in progress. (70% completed)
  • Terrace floor parapet wall work is in progress.
  • 3rd floor gypsum ceiling plastering work is in progress.
  • 1st floor wall gypsum plastering work is completed.
  • 2nd floor wall gypsum plastering work is in progress.
  • 3rd floor toilet concealed plumbing work is in progress.
  • Upto 5th floor block work is completed
  • 1st and 2nd floor wall gypsum plastering work is completed.
  • 3rd floor gypsum plastering work is in progress.
  • 4th floor toilet concealed plumbing work is completed.