Contact Us

Ramaniyam Real Estates,

14/67, 3rd Main Rd,

Gandhi Nagar, Adyar

Chennai 600 020

+91 4443447500 +91 9710928855 +91 7299922617 sales@ramaniyam.com

Shyamala

Mandaveli

Download Brochure

Download file

Enquire Now

Amenities

Generator Backup
CCTV
Rain Water Harvesting

Model Flat

Master Layout Plan

Availability

Flat No. Floor Type Area Facing Layout Availability
2A 2 3BHK + 2T 1077 West Not Available Sold Out
3C 3 2BHK + 2T 1036 East Not Available Sold Out
4A 4 3BHK + 2T 1077 West Not Available Sold Out
4B 4 3BHK + 2T 1077 East Not Available Sold Out
1D 1 2BHK + 2T 1036 West Available
3B 1 3BHK + 2T 1077 North Sold Out
1A 1 3BHK + 2T 1077 North Sold Out
1B 1 3BHK + 2T 1077 East Sold Out
3A 3 3BHK + 2T 1077 West Sold Out
2D 2 2BHK + 2T 1036 West Available
1C 1 2BHK + 2T 1036 East Available
4D 4 2BHK + 2T 1036 West Available
4C 4 2BHK + 2T 1036 East Available
5A 1 3BHK + 2T 1038 North Sold Out
5D 5 2BHK + 2T 972 West Sold Out
2C 1 2BHK + 2T 1036 North Sold Out
3D 3 2BHK + 2T 1036 West Sold Out
5C 5 2BHK + 2T 972 East Sold Out
2B 2 3BHK + 2T 1077 East Sold Out
5B 5 3BHK + 2T 1038 East Sold Out

Approvals

Planning Permit No:

OL-PP/NHRB/0189/2023

Date of Permit:

2023-05-23

Building Permission No:

CEBA/WDCN13/00216/2023

Date of Permit:

2023-06-08

TNRERA:

TN/29/Building/284/2023

Dated:

2023-06-30

Project Update Images

  • 3rd floor general flooring and toilet wall tiles laying work is in progress. (70% completed).
  • Lift erection work is completed.
  • External drainage chamber work is in progress. (80% completed)
  • Compound wall work is in progress. (80% completed)
  • 3rd floor general flooring and toilet wall tiles laying work is in progress. (75% completed).
  • Lift erection work is completed.
  • External drainage chamber work is completed.
  • Compound wall work is completed.
  • 3rd floor general flooring tiles laying work is in progress. (75% completed).
  • Lift erection work is completed.
  • External drainage chamber work is completed.
  • Compound wall work is completed.
  • 3rd floor general flooring tiles laying work is in progress. (75% completed).
  • Lift erection work is completed.
  • Setback area GSB filling work is in progress. (50% completed).
  • Duct covering work is in progress. (70% completed).
  • Compound wall work is completed.