Senate

K K Nagar

Download Brochure

Download file

Enquire Now

Amenities

Generator Backup
Elevators
24/7 Power Backup
Rain Water Harvesting
Wheel Chair Friendly

Master Layout Plan

Availability

Flat No. Floor Type Area Facing Layout Availability
702 7 3BHK + 3T 1787 South Available
205 2 3BHK + 3T 1658 South Available
802 8 3BHK + 3T 1787 South Available
902 9 3BHK + 3T 1787 South Available
904 9 3BHK + 2T 1443 South Available
305 3 3BHK + 3T 1658 South Available
605 6 3BHK + 3T 1658 South Available
705 7 3BHK + 3T 1658 South Available
805 8 3BHK + 3T 1658 South Available
905 9 3BHK + 3T 1658 South Available
906 9 3BHK + 3T 1658 North Available

Approvals

Planning Permit No:

C / PP / MSB / 64 (A to D ) / 2021

Date of Permit:

2022-01-03

Building Permission No:

CEBA / WDCN10 / 00030 / 2022

Date of Permit:

2022-01-27

TNRERA:

TN/29/Building/0090/2022

Dated:

2022-03-28

Project Update Images

  • 7th, 8th and 9th floor kitchen and toilet plumbing pipe line work is in progress. (40% completed)
  • 6th floor toilet wall tile laying work is in progress (30% completed)
  • 6th floor general flooring work is in progress. (30% completed)
  • Terrace floor corridor flooring work is 80% completed
  • Upto 5th Door shutter fixing work is in progress. (75% completed)
  • Balcony handrail fixing work is in progress. (50% completed)
  • External plastering work is in progress. (95% completed).
  • External texture painting work is in progress. (90% completed).
  • Firefighting work is in progress. (70% completed)
  • All side compound wall work is in progress. (60% completed).
  • 8th and 9th floor kitchen and toilet plumbing pipe line work is in progress. (40% completed)
  • 6th floor toilet wall tile laying work is in progress (30% completed)
  • 6th floor general flooring work is in progress. (30% completed)
  • Terrace floor corridor flooring work is 80% completed
  • Upto 5th Door shutter fixing work is in progress. (75% completed)
  • Balcony handrail fixing work is in progress. (60% completed)
  • External plastering work is in progress. (95% completed).
  • External texture painting work is in progress. (90% completed).
  • Firefighting work is in progress. (90% completed)
  • All side compound wall work is in progress. (90% completed).
  • Lift Wall cladding work is in progress (1/2 completed)
  • 8th and 9th floor kitchen and toilet plumbing pipe line work is in progress. (45% completed)
  • 6th floor toilet wall tile laying work is in progress (30% completed)
  • 6th floor general flooring work is in progress. (30% completed)
  • Terrace floor corridor flooring work is 85% completed
  • Upto 5th Door shutter fixing work is in progress. (80% completed)
  • Balcony handrail fixing work is in progress. (65% completed)
  • External plastering work is in progress. (95% completed).
  • External texture painting work is in progress. (90% completed).
  • Firefighting work is in progress. (90% completed)
  • All side compound wall work is in progress. (90% completed).
  • 8th and 9th floor kitchen and toilet plumbing pipe line work is in progress. (45% completed)
  • 6th floor toilet wall tile laying work is in progress (30% completed)
  • 6th floor general flooring work is in progress. (30% completed)
  • Terrace floor corridor flooring work is 85% completed
  • Upto 5th Door shutter fixing work is in progress. (80% completed)
  • Balcony handrail fixing work is in progress. (65% completed)
  • External plastering work is in progress. (95% completed).
  • External texture painting work is in progress. (90% completed).
  • Firefighting work is in progress. (90% completed)
  • All side compound wall work is in progress. (90% completed).
  • 8th and 9th floor kitchen and toilet plumbing pipe line work is in progress. (50% completed)
  • 6th floor toilet wall tile laying work is in progress (35% completed)
  • 6th floor general flooring work is in progress. (35% completed)
  • Upto 5th Door shutter fixing work is in progress. (85% completed)
  • Balcony handrail fixing work is in progress. (75% completed)
  • External texture painting work is in progress. (95% completed).
  • Firefighting work is completed
  • All side compound wall work is in progress. (90% completed).
  • Wood work is in progress. (Flat 203,204,206,301 and 403)