Floor | Flat/Section | Area (Sq.ft) | AVAILABILITY |
---|---|---|---|
Floor 1 | 1A | 1500 | SOLD OUT |
Floor 1 | 1B | 1378 | SOLD OUT |
Floor 1 | 1C | 801 | SOLD OUT |
Floor 1 | 1D | 1378 | SOLD OUT |
Floor 1 | 1E | 1500 | SOLD OUT |
Floor 2 | 2A | 1657 | SOLD OUT |
Floor 2 | 2B | 1378 | SOLD OUT |
Floor 2 | 2C | 801 | SOLD OUT |
Floor 2 | 2D | 1378 | AVAILABLE |
Floor 2 | 2E | 1657 | SOLD OUT |
Floor 3 | 3A | 1732 | SOLD OUT |
Floor 3 | 3B | 1378 | SOLD OUT |
Floor 3 | 3C | 801 | SOLD OUT |
Floor 3 | 3D | 1378 | SOLD OUT |
Floor 3 | 3E | 1732 | SOLD OUT |
Floor 4 | 4A | 1732 | SOLD OUT |
Floor 4 | 4B | 1410 | SOLD OUT |
Floor 4 | 4C | 801 | SOLD OUT |
Floor 4 | 4D | 1410 | SOLD OUT |
Floor 4 | 4E | 1732 | SOLD OUT |
Project Status as on 13th May 2019
-
Site View
-
Landscaping work is completed
-
Front glass fixing work completed
-
Site name board work is completed
-
Landscaping work is completed
-
Benco_13.05.19-4-225x300
-
Final painting work in progress (1 flats)
-
Final painting work is in progress (1 flats)
-
Final painting work is in progress (1 flats)
-
Terrace floor OTS covering work is in progress
-
Terrace floor OTS covering work is in progress
- Final finishing work is in progress.
- Flats wood work is in progress (2 flats)
- Flats wood work is completed (16/20)
- Final painting work is in progress ( 1 flats)
- Final painting work is completed (16/20 flats)
- Flats handed over (13/20 flats)
- C C obtained.
- Metro and drainage connection obtained
Project Status as on 6th May 2019
-
Elevation View
-
Elevation View
-
Name board fixing is completed
-
Lift cladding work is completed
-
Lobby flooring work is completed
-
Staircase handrail fixing work is completed
-
Entrance glazing work is completed
-
Paving work is completed
-
Pathway stone laying work is completed
-
Landscape work is completed
-
DG work fixing work is completed
- Final finishing work is in progress.
- Flats wood work is in progress (2 flats)
- Flats wood work is completed (16/20)
- Final painting work is completed (16/20 flats)
- Flats handed over (13/20 flats)
- C.C obtained.
- Metro and drainage connection obtained
Project Status as on 29th Apr 2019
-
Site View
-
Flats handed over (13/20 flats)
-
Flats handed over (13/20 flats)
-
Final painting work is completed (16/20 flats)
-
Flats wood work is completed (16/20)
-
final painting work is completed (16/20 flats)
-
Flats wood work is completed (16/20)
-
final painting work is completed (16/20 flats)
-
Flats wood work is in progress (2 flats)
-
final painting work is in progress (1 flats)
-
Flats wood work is in progress (2 flats)
- Final finishing work is in progress.
- Flats wood work is in progress (2 flats)
- Flats wood work is completed (16/20)
- Final painting work is in progress ( 1 flats)
- Final painting work is completed (16/20 flats)
- Flats handed over (13/20 flats)
- C.C obtained.
- Metro and drainage connection obtained
Project Status as on 23rd Apr 2019
-
Front side View
-
Final finishing work is in progress
-
Final painting work is in progress (2 flats)
-
Flats wood work is completed (16/20)
-
Final painting work is in progress (2 flats)
-
Toilet CP & Sanitary fittings fixing work is in progress
-
Final painting work is in progress (2 files)
-
Flats wood work is in progress (2 files)
-
Final finishing work is in progress
- Final finishing work is in progress.
- Flats wood work is in progress (2 flats)
- Flats wood work is completed (16/20)
- Final painting work is in progress ( 2 flats)
- Final painting work is completed (14/20 flats)
- Flats handed over (13/20 flats)
- C.C obtained.
- Metro and drainage connection obtained
Project Status as on 16th Apr 2019
-
N/E side view
-
Benco_16.04.19-10-300x150
-
Final painting work is in progress (3 flats)
-
Final painting work is in progress (3 flats)
-
Flats wood work is in progress (4 flats)
-
Flats wood work is completed (14/20)
-
Flats wood work is completed (14/20)
-
All toilet CP & Sanitary fitting fixing work is completed
-
Flats wood is in progress (4 flats)
-
Terrace floor weather shield painting work is in progress
-
Terrace floor weather shield painting work is in progress
- Final finishing work is in progress
- Flats wood work is in progress (4 flats)
- Flats wood work is completed (14/20)
- Final painting work is in progress (3 flats)
- Final painting work is completed (11/20 flats)
- Flats handed over (11/20 flats)
- C.C obtained.
- Metro and drainage connection obtained
Project Status as on 10th Apr 2019
-
Site view
-
Landscaping work is completed
-
Final finishing work is in progress
-
Flats handed over (11/20 flats)
-
Flats handed over (11/20 flats)
-
Flats wood work is completed (14/20)
-
Toilet cp & Sanitary fitting fixing work is completed
-
Toilet cp & Sanitary fitting fixing work is completed
-
Flats wood work is completed (14/20)
-
Flats wood work is completed (14/20)
-
4th floor general flooring work is completed
-
4th floor general flooring work is completed
- 4th floor toilet wall tile laying work is completed.
- 4th floor general flooring work is completed.
- Flats wood work is in progress (4 flats)
- Flats wood work is completed (14/20)
- Final painting work is in progress (3 flats)
- Final painting work is completed (11/20 flats)
- Flats handed over (11/20 flats)
- C.C obtained.
- Metro and drainage connection obtained
Project Status as on 2nd Apr 2019
-
Site view
-
Gate fixing work is completed
-
Landscaping work is completed
-
External ramp work is completed
-
Flats handed over (9/20 flats)
-
Landscaping work is completed
-
Flats handed over (9/20 flats)
-
Flats wood work is completed (14/20)
-
Flats wood work is in progress (3 flats)
-
Flats wood work is completed (14/20)
-
Final painting work is in progress (3 flats)
- 4th floor toilet wall tile laying work is 80% completed.
- 4th floor general flooring work is 80% completed.
- Kitchen wall tile laying work is 80% completed.
- Flats wood work is in progress (3 flats)
- Flats wood work is completed (14/20)
- Final painting work is in progress (3 flats)
- Final painting work is completed (11/20 flats)
- Flats handed over (9/20 flats)
- C .C obtained.
- Metro and drainage connection obtained
Project Status as on 19th Mar 2019
-
Site view
-
Car parking work is completed
-
Multipurpose hall finishing work is completed
-
Double ht lobby flooring work is completed
-
Landscaping work is completed
-
Landscaping work is completed
-
Staircase handrail fixing work is completed
-
Flats wood work is in progress (4 flats)
-
Flats wood work is in progress (4 flats)
-
Flats wood work is in progress (4 flats)
-
Flats wood work is in progress (4 flats)
-
Flats wood work is completed (4 flats)
-
Flats handed over (7/20 flats)
- 4th floor toilet wall tile laying work is 80% completed.
- 4th floor general flooring work is 80% completed.
- Kitchen wall tile laying work is 80% completed.
- Flats wood work is in progress (4 flats)
- Flats wood work is completed (12/20)
- Final painting work is in progress (4 flats)
- Final painting work is completed (8/20 flats)
- Flats handed over (7/20 flats)
- C .C obtained.
- Metro and drainage connection obtained
Planning permit No : B / Spl.Bldg / 348 A to E / 2017, dated – 22-12-2017.
Building permit No : CEBA / WDCN13 / 00056 / 2018, dated – 20-02-2018.
CC.No. : CC.No.EC / South-I / 367 / 2018, dated – 23-11-2018.
TNRERA No : TN / 29 / Building / 0188 / 2018, dated – 06-06-2018.
Ramaniyam Benco is situated in a posh yet serene locality in Besant Nagar, a stone’s throw away from Elliots Beach. The property covers 5.15 grounds and houses 20 apartments in a spacious 3 BHK configuration, a perfect fit for those who prefer smaller communities. The proximity to the beach makes for invigorating morning walks and healthy activities.
CONSTRUCTION SPECIFICATIONS
1.TYPE OF CONSTRUCTION
- RCC framed structure with non load bearing porotherm and cement mortar walls.
- Ceiling height will be 10’6” approximately except in the toilet where it will be 9’6”.
- Generally internal partition walls will be 4 inches and outer walls will be 6 inches.
2.WALL FINISH
- Walls will generally be plastered and painted inside and outside.
- In the toilets walls will be covered with bonzer or equivalent ceramic tiles up to 7 feet height.
- In the wash area ceramic tiles will be provided up to a height of parapet.
- Ceramic tiles will be plain series.
3.FLOORING
- Flooring will be 2 x 2 Bonzar/Kajaria /equivalent vitrified tiles for living, dining & bedrooms.
- Bathroom tiles will be of 16 x16 ceramic tiles of Bonzar/Kajaria or equivalent as per builders choice.
4.DOORS
- Main door will be first quality teak wood frame with panelled solid wooden door finished with varnish.
- Other doors will be with first quality country wood frames with panelled solid wooden door finished with paint.
- All door fittings will be of Dorma make.
- Main door will be provided with lock, one aldrop, Tower bolt, safety chain and peep hole. (Dorma make)
- Doors to the bedrooms will be provided with Dorma locks.
5.WINDOWS AND VENTILATORS
- Pre fabricated windows of Fenesta will be provided.
- Ventilators will be of first quality wooden frames with glass louvers.
- Provision for installation for split Air-conditioners will be provided in all the bed rooms.
6.KITCHEN
- G 20 Black Granite slab will be provided for the kitchen cooking platform.
- A Single or double bowl stainless steel sink with drain board will be provided
7.PLUMBING AND SANITARY FITTINGS
- Plumbing lines from the overhead tank to each floor.
- All closets and wash basins will be white colour ( parryware or equivalent).
- Provision in plumbing for connecting one geyser in each toilet.
- Hot and cold mixtures for shower in each bathroom.
- Toilet closets will be floor / wall mounted EWC / IWC as desired by the Owners.
- Bathroom fittings – Jagquar continental CP fittings.
- Health faucets will be provided in each toilet.
8.WATER SUPPLY
- Two common bore wells and one sump ( 15000 liters capacity) will be provided. One additional sump shall be provided if desired by the OWNERS at additional cost of Rs.7,500/- per flat per owner.
- Three pumps two for bore and one for metro water will be provided.
- Overhead tank with adequate capacity will be provided.
- Water meter for each flat shall be provided at additional cost @ Rs.2,500/- per flat, if required.
9.ELECTRICAL
- Concealed copper wiring with ISI branded cables (anchor or equivalent) and modular switches of MK or equivalent brand will be provided.
- Separate meter will be provided for lighting in common areas, the lift and the pumps / motors.
- Three phase power supply with automatic phase change over switches will be provided in each flat.
- 15 Amp power plug sockets will be provided for water heater in the toilet, for air conditioners in the bedrooms, two in the kitchen and one in the service balcony for washing machine.
- In all the flats 3 Nos., 5 AMP sockets will be provided in the kitchen.
- Two 5 amp plug sockets will be provided in each bed room. In the living room an additional multiple socket with 3 outlets will be provided.
- One calling bell point will be provided.
- Except for the light points in the staircase and one light point in each bedroom, all other light and fan points will be controlled from single point.
10.OTHERS
- One common name board and letter boxes for each flat will be provided at the entrance to the building.
- Concealed PVC pipes for TV antenna will be provided in the living room and bed rooms.
- A common board will be provided near the entrance to the building for incoming telephone line, with provision for concealed wiring from this board to one in the living room and each one in the bed rooms and study rooms.
- The common area within the compound shall be paved and suitably landscaped.
- Two Kone lifts will be provided.
- Generator (Cummins or equivalent brand) of required KVA to take care of the common amenities like motor, lift and all other 5 amp point inside the flat will be provided.
- Rainwater harvesting will be carried out in the proposed building.
- Air conditioned Multipurpose Hall will be provided.
Amenities
- Elevators
- Power Backup
- Rainwater Harvesting