Project Status+
Project Status as on 06th May 2019
-
Elevation view
-
duct covering work progress
-
Compound wall rough stone work progress
-
All floors doors fixing work is completed
-
All floor french door fixing work completed
-
All floor utility tile work is completed
-
All floor toilet tiles work is completed
- 1st & 2nd floor first coat painting work is in progress.
- Lift erection work is completed.
- External 1st coat painting work is completed.
- External ramp work is in progress.
- External plumbing work is in progress.
- External paving block laying work is in progress
no images were found
Project Status as on 29th Apr 2019
-
External 1st coat painting work is completed.
-
External paving block laying work is in progress
-
External duct covering work is in progress
-
Main door 1st coat varnish work is in progress
-
All floor toilet sanitary fitting fixing work is in progress
-
1st & 2nd floor first coat painting work is in progress
-
1st & 2nd floor first coat painting work is in progress
-
1st & 2nd floor first coat painting work is in progress
- 1st & 2nd floor first coat painting work is in progress.
- Lift erection work is completed.
- External 1st coat painting work is completed.
- External ramp work is in progress.
- External plumbing work is in progress.
- External paving block laying work is in prog
Project Status as on 23rd Apr 2019
-
Site view
-
External 1st coat painting work is completed.
-
1st & 2nd floor first coat painting work is in progress.
-
1st & 2nd floor first coat painting work is in progress.
-
1st & 2nd floor first coat painting work is in progress.
-
All floors Door painting work is in progress
-
Toilet CP & Sanitary fittings fixing work is in progress
- 1st & 2nd floor first coat painting work is in progress.
- Lift erection work is completed.
- External 1st coat painting work is completed.
- External ramp work is in progress.
- External plumbing work is in progress.
- External paving block laying work is in progress
Project Status as on 16th Apr 2019
-
External 1st coat painting work is completed
-
External paving block laying work is in progress
-
Lift erection work is completed.
-
1st & 2nd floor first coat painting work is in progress
-
1st & 2nd floor first coat painting work is in progress
-
Toilet Cp & Sanitary fitting fixing work is in progress
- 1st & 2nd floor first coat painting work is in progress.
- Lift erection work is completed.
- External 1st coat painting work is completed.
- External ramp work is in progress.
- External plumbing work is in progress.
- External paving block laying work is in progress
Project Status as on 10th Apr 2019
-
External 1st coat painting work is completed.
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
Staircase handrail fixing work is in progress
-
Compound wall stone cladding fixing work is in progress
-
External paving block laying work is in progress
- All floor primer coat painting work is in progress.
- 3rd floor general tile flooring work is completed.
- Lift erection work is in progress
- External 1st coat painting work is completed.
- External ramp work is in progress.
- External plumbing work is in progress.
- External paving block laying work is in progress
Project Status as on 2nd Apr 2019
-
Site view
-
3rd floor general tile flooring work is in progress
-
3rd floor general tile flooring work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
External paving block laying work is in progress
-
External paving block laying work is in progress
-
Compound wall granite laying work is in progress
- All floor primer coat painting work is in progress.
- 3rd floor general tile flooring work is in progress.
- Lift erection work is in progress
- Balcony handrail fixing work is completed.
- External 1st coat painting work is in progress.
- External setback area earth filling work is in progress.
- External ramp work is in progress.
- External plumbing work is in progress.
- External paving block laying work is in progress
Project Status as on 26th Mar 2019
-
External 1st coat painting work is in progress
-
Balcony handrail fixing work is completed
-
Lift erection work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
- All floor primer coat painting work is in progress.
- 3rd floor general tile flooring work is in progress.
- Lift erection work is in progress
- Balcony handrail fixing work is completed.
- External 1st coat painting work is in progress.
- External setback area earth filling work is in progress.
- External ramp work is in progress.
- External plumbing work is in progress
Project Status as on 19th Mar 2019
-
External 1st coat painting work is in progress
-
Stilt floor car parking screed flooring work is completed
-
Stilt floor car parking screed flooring work is completed
-
Flat electrical wiring work is in progress
-
All floor primer coat painting work is in progress
-
ll floor primer coat painting work is in progress
-
All floor primer coat painting work is in progress
- All floor primer coat painting work is in progress.
- 3rd floor general tile flooring work is in progress.
- Staircase handrail fixing work is in progress.
- Lift erection work is in progress
- Balcony handrail fixing work is completed.
- External 1st coat painting work is in progress.
- External setback area earth filling work is in progress.
- External ramp work is in progress
Project Status as on 12th Mar 2019
-
Site view
-
External ramp work is completed
-
All floor primer coat painting work is in progress
-
Lift erection work is in progress
-
All floor kitchen tile work is completed.
-
All floor primer coat painting work is in progress
-
3rd floor general tile flooring work is in progress
-
Door shutter fixing work is in progress
-
Door shutter fixing work is in progress
Government Approvals+
Planning permit No : B / Spl.Bldg / 90 / 2018, dated – 11-05-2018.
Building permit No : CEBA / WDCN13 / 00193 / 2018, dated – 22-06-2018.
TNRERA No : CC.No.EC / South-I / 133 / 2019, dated – 10-05-2019.
Construction Specifications+
CONSTRUCTION SPECIFICATIONS
The Flat is to be constructed to this specification subject to minor changes in dimension, location found desirable or necessary to ensure sound engineering practice at the sole discretion of the Builder.
- TYPE OF CONSTRUCTION
- RCC framed structure with non load bearing POROTHERM / BRICK masonry walls.
- Ceiling height will be 11 feet approximately, except in the toilet where it will be 10 feet.
- Generally internal partition walls will be 4 inches and outer walls will be 6 inches.
2.0 WALL FINISH
- Walls will generally be plastered and painted inside and outside.
- In the toilets, walls will be covered with ceramic tiles upto full height.
- In the wash area, tiles will be provided upto the height of 2 feet.
- Ceramic tiles will be designer series as per builder’s Architect choice.
3.FLOORING
- Flooring will be vitrified tiles 2′ x 2′.
- Bathroom and balcony flooring tiles will be of anti skid ceramic Tiles.
4.DOORS
- Main door frame will be of good quality wood with panelled solid wooden door finished with varnish.
- Other doors will be with good quality wood frames and flush doors finished with paint.
- All door fittings will be Dorma make.
- Main door will be provided with Dorma lock, one aldrop, safety chain and peep hole.
- Doors to the bedrooms will be provided with Dorma locks.
5.WINDOWS AND VENTILATORS
- Pre fabricated windows of Fenesta make will be provided.
- Ventilators will be of good quality wooden frames with glass louvers.
- Split A/c provision will be provided in all bedrooms, living and dining.
6.0 KITCHEN
- G 20 Black Granite slab will be provided for the kitchen cooking platform.
- A Single bowl stainless steel sink with drain board will be provided.
7.0 PLUMBING AND SANITARY FITTINGS
- Concealed plumbing lines from the overhead tank for each floor.
- All closets and wash basins will be of white colour (Parryware).
- Provision in plumbing for connecting one geyser in each toilet.
- Hot and cold mixers for shower and tap in each toilet .
- Toilet closets will be floor / wall mounted EWC / IWC as desired by the owners.
- Bathroom fittings – Jaguar continentals / equivalent.
- Health faucets will be provided in each toilet.
8.0 WATER SUPPLY
- One common bore well and metro water sump will be provided.
- Two pumps one for bore and one for sump will be provided.
- Common overhead tank with separate water lines for each floor will be provided
9.0 ELECTRICAL
- Concealed copper wiring with Anchor / equivalent and MK or equivalent switches will be provided.
- Separate meter will be provided for lighting in common areas, the lift and the pumps / motors.
- Three phase power supply with automatic phase change over switches will be provided in each flat.
- 15 Amp power plug sockets will be provided for water heater in the toilet, for air conditioners in the bedrooms, two in the kitchen and one in the service balcony for washing machine.
- In all the flats, 5 Nos., 5 AMP sockets will be provided in the kitchen.
- Two 5 amp plug sockets will be provided in each room, in the living room in addition a multiple socket with 3 outlets will be provided for connections to TV, stereo and VCR.
- One calling bell point will be provided.
- 9Light points in the staircase and light and fan points on the bed side in bedrooms will be controlled from single point.
- Generator with sufficient capacity for lift, pumps and lights in common areas and all light and fan points inside the flats will be provided.
Building Specifications+
Layout Details+
Property Features+
Amenities
- Elevators
- Power Backup
- Rainwater Harvesting
Property Details+
FLat Area: 1530 Sq. Ft
Bedrooms: 3
Bathrooms: 3