
Floor | Flat / Section | Carpet Area | Area (Sq. Ft.) | SOLD OUT | No of Bedrooms |
---|---|---|---|---|---|
Floor 1 | FLAT – 1 | 1226 | 1618 | SOLD OUT | Three |
FLAT – 2 | 1196 | 1618 | AVAILABLE | Three | |
Floor 2 | FLAT – 3 | 1195 | 1618 | SOLD OUT | Three |
FLAT – 4 | 1196 | 1618 | SOLD OUT | Three | |
Floor 3 | FLAT – 5 | 1163 | 1618 | SOLD OUT | Three |
FLAT – 6 | 1196 | 1618 | SOLD OUT | Three | |
Floor 4 | FLAT – 7 | 1195 | 1618 | SOLD OUT | Three |
FLAT – 8 | 1196 | 1618 | SOLD OUT | Three |
Projects status as on 25th January 2021
Projects status as on 18th January 2021
Projects status as on 11th January 2021
Projects status as on 4th January 2021
Projects status as on 28th December 2020
Projects status as on 21st December 2020
Projects status as on 14th December 2020
Projects status as on 7th December 2020
Projects status as on 30th November 2020
Projects status as on 23rd November 2020
Projects status as on 16th November 2020
Projects status as on 9th November 2020
-
-
-
-
-
-
-
-
- Flat final coat painting work is in progress.(Flat 5,6,7 & 8 completed)
- Flat wood work is in progress. (Flat 2 & 3)
- Flat wood work is completed. (Flat 4,5,6,7&8)
- Lift erection work is completed.
- Lift wall cladding work is completed.
- Lift wall cladding work is completed.
- All service connection is obtained.
Projects status as on 2nd November 2020
Projects status as on 27th October 2020
Projects status as on 19th October 2020
Projects status as on 12th October 2020
Projects status as on 5th October 2020
Projects status as on 28th September 2020
Projects status as on 21st September 2020
Projects status as on 14th September 2020
Projects status as on 7th September 2020
Projects status as on 31st August 2020
-
-
-
-
-
-
-
- Flat final coat painting work is in progress.
- All floor Door fixing work is in progress.
- Flat wood work is in progress. (Flat 2, 3, 4, 6 & 8)
- Flat wood work is completed. (Flat 8)
- Lift erection work is completed.
- Lift wall cladding work is completed.
- External paving block laying work is completed.
- Project C.C obtained.
Projects status as on 24th August 2020
Projects status as on 17th August 2020
Projects status as on 10th August 2020
Projects status as on 3rd August 2020
Projects status as on 27th July 2020
-
-
-
-
-
-
-
- Upto 3rd floor – Primer coat painting work is completed.
- All floor Door fixing work is in progress.
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is completed.
- Compound wall brick work is completed.
- External paving block laying work is completed.
Projects status as on 20th July 2020
-
-
-
-
-
-
-
- Upto 3rd floor – Primer coat painting work is completed.
- All floor Door fixing work is in progress.
- Flat wood work is in progress. (Flat 6 & 8)
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is completed.
- Compound wall brick work is completed.
- External paving block laying work is in progress.
Projects status as on 13th July 2020
-
-
-
- Upto 3rd floor – Primer coat painting work is completed.
- All floor Door fixing work is in progress.
- Flat wood work is in progress. (Flat 6 & 8)
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is completed.
- Compound wall brick work is completed.
Projects status as on 7th July 2020
-
-
-
-
-
-
-
- Upto 3rd floor – Primer coat painting work is completed.
- All floor Door fixing work is in progress.
- Flat wood work is in progress. (Flat 6)
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is completed.
- Compound wall brick work is completed.
Projects status as on 15th June 2020
Projects status as on 1st June 2020
-
-
-
-
-
-
-
-
- Upto 3rd floor – Primer coat painting work is completed
- All floor Door fixing work is in progress.
- All floor UPVC window fixing work is in progress.
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is completed.
- Compound wall brick work is completed.
Projects status as on 25th May 2020
-
-
-
-
-
-
-
-
- Upto 3rd floor – Primer coat painting work is completed
- All floor Door fixing work is in progress.
- All floor UPVC window fixing work is in progress.
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is completed.
- Compound wall brick work is completed.
Projects status as on 18th May 2020
Projects status as on 16th March 2020
-
-
-
-
-
-
-
-
- Upto 3rd floor inner wall plastering work is completed.
- Upto 3rd floor – 1st coat wall putty work is in progress
- Upto 3rd floor toilet plumbing concealed pipe line work is completed.
- Upto 3rd floor toilet wall tile laying work is completed.
- External primer coat painting work is completed.
- Terrace weathering course work is completed.
- External chamber brick work is in progress.
- Compound wall brick work is in progress.
Projects status as on 9th March 2020
-
-
-
-
-
-
-
- Upto 3rd floor inner wall plastering work is completed.
- Upto 3rd floor – 1st coat wall putty work is in progress
- Upto 3rd floor toilet plumbing concealed pipe line work is completed.
- Upto 3rd floor toilet wall tile laying work is completed.
- External primer coat painting work is in progress.
- Terrace weathering course work is completed.
- External chamber brick work is in progress.
- Compound wall brick work is in progress.
Projects status as on 2nd March 2020
-
-
-
-
-
-
-
-
- All floor block work is completed.
- Upto 3rd floor inner wall plastering work is completed.
- Upto 3rd floor – 1st coat wall putty work is in progress
- Upto 3rd floor toilet plumbing concealed pipe line work is completed.
- 1st and 2nd floor toilet wall tile laying work is completed.
- External primer coat painting work is in progress.
- Terrace weathering course work is in progress.
- External chamber brick work is in progress.
Projects status as on 24th February 2020
-
-
-
-
-
-
-
-
- All floor block work is completed.
- Upto 3rd floor inner wall plastering work is completed.
- Upto 3rd floor – 1st coat wall putty work is in progress
- Upto 3rd floor toilet plumbing concealed pipe line work is completed.
- 1st and 2nd floor toilet wall tile laying work is completed.
- External plastering work is completed.
- Terrace weathering course work is in progress.
Project Status as on 30th December 2019
-
-
-
-
-
-
-
- Upto 3rd floor block work is completed.
- 4th floor block work is in progress.
- Stilt floor ceiling plastering work is 90% completed.
- Upto 3rd floor ceiling plastering work is completed.
- Upto 2nd floor inner wall plastering work is completed.
- 3rd floor inner wall plastering work is in progress.
- 1st and 2nd floor toilet plumbing concealed pipe line work is in progress
Planning permit No : B /spl.bldg /107 A & B / 2019, dated – 10-06-2019.
Building permit No : CEBA / WDCN13 / 00145 / 2019, dated – 05-07-2019.
TNRERA No : TN / 29 / Building / 0202 / 2019, dated – 13-11-2019.
CONSTRUCTION SPECIFICATIONS
The flat is to be constructed to this specification subject to minor changes in dimension, locations found desirable or necessary to ensure sound engineering practice at the sole discretion of the Builder.
1.TYPE OF CONSTRUCTION
1.1 RCC framed structure with non load bearing porotherm and cement mortar walls.
1.2 Ceiling height will be 10’ 6” approximately except in the toilet where it will be 9’6”.
1.3 Generally internal partition walls will be 4 inches and outer walls will be 6 inches.
2. WALL FINISH
2.1 Walls will generally be plastered and painted inside and outside.
2.2 In the toilets walls will be covered with Asian or equivalent ceramic tiles up to 7 feet height.
2.3 In the wash area ceramic tiles will be provided up to a height of parapet.
2.4 Ceramic tiles will be plain series.
3. FLOORING
3.1 Flooring will be 800mm x 800mm Bonzar or equivalent vitrified tiles for living, dining & bedrooms or equivalent make.
3.2 Bathroom tiles will be of 16 x16 ceramic tiles of Bonzar or equivalent reputed make of builder’s choice.
4. DOORS
4.1 Main door will be first quality teak wood frame with panelled solid wooden door finished with varnish
4.2 Other doors will be with first quality country wood frames with panelled solid wooden door finished with paint.
4.3 All door fittings will be of Dorma or equivalent.
4.4 Main door will be provided with lock, one aldrop, Tower bolt, safety chain and peep hole (Dorma make).
4.5 Doors to the bedrooms will be provided with Dorma locks.
5. WINDOWS AND VENTILATORS
5.1 Pre fabricated windows of Fenesta / Aluminium will be provided.
5.2 Pre fabricated Ventilators of Fenesta / Aluminium will be provided.
5.3 Provision for split air conditioner will be provided in all the bedrooms.
6. KITCHEN
6.1 G 20 Black Granite slab will be provided for the kitchen cooking platform.
6.2 A Single bowl stainless steel sink with drain board will be provided
7. PLUMBING AND SANITARY FITTINGS.
7.1 Plumbing lines from the overhead tank to each floor.
7.2 All closets and wash basins will be white colour.
7.3 Provision in plumbing for connecting one geyser in each toilet.
7.4 Hot and cold mixtures for shower in each bathroom.
7.5 Toilet closets will be floor / wall mounted EWC / IWC as desired by the Owners.
7.6 Bathroom fittings – Jagquar CP fittings.
7.7 Health faucets will be provided in each toilet.
8. WATER SUPPLY
8.1 One common bore well and sump will be provided.
8.2 Two pumps one for bore and one for metro water will be provided.
8.3 Overhead tank with adequate capacity will be provided.
9. ELECTRICAL
- Concealed copper wiring with ISI branded cables and modular switches will be provided.
- Separate meter will be provided for lighting in common areas, the lift and the pumps / motors.
- Three phase power supply with automatic phase change over switches will be provided in each flat.
- 15 Amp power plug sockets will be provided for water heater in the toilet, for air conditioners in the bedrooms, one in the kitchen and one in the service balcony for washing machine.
- In all the flats 3 Nos., 5 AMP sockets will be provided in the kitchen.
- Two 5 amp plug sockets will be provided in each bed room. In the living room an additional multiple socket with 3 outlets will be provided.
- One calling bell point will be provided.
- Except for the light points in the staircase and one light point in each bedroom, all other light and fan points will be controlled from single point.
10. OTHERS
10.1 One common name board and letter boxes for each flat will be provided at the entrance to the building.
10.2 Concealed PVC pipes for TV antenna will be provided in the living room and bed rooms.
10.3 A common board will be provided near the entrance to the building for incoming telephone line, with provision for concealed wiring from this board to one in the living room and each one in the bed rooms and study rooms.
10.4 The common area within the compound shall be paved and suitably landscaped.
10.5 Auto door Kone lift will be provided, as required.
10.6 Generator of adequate capacity to take care of the common amenities like motor, lift and all other 5 amp point inside the flat will be provided.
10.7 Rainwater harvesting will be carried out in the proposed building.
10.8 Common area around the building shall be suitably landscaped
-
- Upto 3rd floor block work is completed.
- 4th floor block work is in progress.
- Stilt floor ceiling plastering work is 90% completed.
- Upto 3rd floor ceiling plastering work is completed.
- Upto 2nd floor inner wall plastering work is completed.
- 3rd floor inner wall plastering work is in progress.
- 1st and 2nd floor toilet plumbing concealed pipe line work is in progress