BALA VIMALAM

5 First Street Venkateshwara Nagar , ,
Available

.

Availability

Floor Flat / Section Area (Sq. Ft.) Availability No of Bedrooms
Floor 1  FLAT 1A  1212 SOLD OUT  Triple
 FLAT 1B  1467 AVAILABLE  Triple
Floor 2  FLAT 2A  1212 SOLD OUT  Triple
 FLAT 2B  1467 SOLD OUT  Triple
Floor 3  FLAT 3A  1212 SOLD OUT  Triple
 FLAT 3B  1467 SOLD OUT  Triple

Construction Specifications

CONSTRUCTION  SPECIFICATIONS

Project Status

Project Status as on 11th June 2018

  • Flats Final painting work is completed (Flat 1A &3A).
  • EB pillar & cable laying work is completed
  • Metro & Drainage connection obtained.
  • C.C obtained.

Project Status as on 4th June 2018

  • All floor primer coat painting work is completed.
  • Final painting work is in progress (flat – 1A &2A).
  • External final coat painting work is completed.
  • External paving laying work is completed.
  • External ramp work is completed.
  • EB pillar & cable laying work is in progress.
  • Metro & Drainage connection obtained

Project Status as on 28th May 2018

  • All floor primer coat painting work is completed.
  • Final painting work is in progress.
  • Lift erection work is completed.
  • External final coat painting work is completed.
  • External paving laying work is completed.
  • External ramp work is completed.
  • Metro & Drainage connection obtained.

Project Status as on 21st May 2018

  • All floor primer coat painting work is completed.
  • Final painting work is in progress.
  • Lift erection work is completed.
  • Lift wall cladding work is completed.
  • External final coat painting work is completed.
  • External paving laying work is completed.
  • External ramp work is in progress

Project Status as on 11th May 2018

  • All floor primer coat painting work is in progress.
  • Lift erection work is in progress.
  • Lift wall cladding work is in progress.
  • External final coat painting work is completed.
  • External paving laying work is completed.
  • External ramp work is in progress

Project Status as on 28th April 2018

  • 1st and 2nd floor 1st coat painting work is in progress.
  • Lift erection work is in progress.
  • Lift wall cladding work is in progress.
  • External final coat painting work is completed.
  • External paving laying work is completed

Project Status as on 21st April 2018

  • All floor 1st and 2nd coat putty work is completed.
  • 1st and 2nd floor 1st coat painting work is in progress.
  • External drainage chamber work is completed.
  • Terrace floor plumbing work is completed.
  • Lift erection work is in progress.
  • External final coat painting work is completed
  • External paving laying work is in progress

Project Status as on 13th April 2018

  • All floor 1st and 2nd coat putty work is completed.
  • Staircase flooring work is completed.
  • All floor window grill fixing work is completed.
  • Front gate fixing work is completed.
  • External drainage chamber work is in progress.
  • Terrace floor plumbing work is in progress.
  • Sump work is completed.

Rainwater Harvesting
Elevators
Power Backup

Enquire Now

Compare properties

Similar Listings

Available

Ramaniyam Benco

...
Besant Nagar
Available

Mandhangini

Comfortable enclosures with well planned amenities on the IT corridor.
Comfortable enclosures with well planned amenities on the IT corridor. ...
Thoraipakkam
Available

Thiruveragam

Spacious and well ventilated apartments with amenities aplenty.
Spacious and well ventilated apartments with amenities aplenty. ...
Teynampet