click to enable zoom
Loading Maps
We didn't find any results
open map
My Location Fullscreen Prev Next
Advanced Search
We found 0 results. Do you want to load the results now ?
Advanced Search
we found 0 results

Your search results

Magnum

Nehru Nagar, Perungudi, ,
Available
VideoFLAT - 203,303,403,503,603,703 & 803FLAT - 204,304,404,504,604,704 & 804FLAT - 205,305,405,505,605,705 & 805Paving block work is in progressExternal painting work progresscorridor flooring work is in progress 2nd, 3rd, 5th, 6th & 7th floor general flooring work is in progress.Paving block work progressCompound wall palstering work completed Rear side External wall palstering work progressSwimming pool work is in progressTrench work is in progressOuter earth filling work is in progressExternal painting work progressFront compound wall arch work is in progressFLAT - 225,325,425,525,625,725 & 825FLAT - 226,326,426,526,626,726 & 826FLAT - 227,327,427,527 & 827 FLAT - 628 FLAT - 728 STILT-FLOOR-PLAN FIRST-FLOOR-PLAN FIFTH-FLOOR-PLAN SIXTH-FLOOR-PLANSEVENTH-FLOOR-PLANEIGHTH-FLOOR-PLAN NINTH-FLOOR-PLAN FLAT - 126 FLAT - 125 FLAT - 124 FLAT - 123 FLAT - 122 FLAT - 121 FLAT - 120 FLAT - 117 FLAT - 118 FLAT - 119 FLAT - 115 FLAT - 116 FLAT - 101 FLAT - 102 FLAT - 103 FLAT - 104 FLAT - 105 FLAT - 114 FLAT - 106 FLAT - 107 FLAT - 108 FLAT - 109 FLAT - 110 FLAT - 111 FLAT - 112 FLAT - 113 FLAT - 828107,207,307,407,507,607,707,807FLAT - 106,206,306,406,506,606,706,806FLAT - 206,306,506,606,706 & 806 FLAT - 127FLAT - 201,301,401,501,601,701 & 801 FLAT-406FLAT - 202,302,402,502,602,702 & 802• 2nd, 3rd, 5th, 6th & 7th floor general flooring work is in progress.• 2nd, 3rd, 5th, 6th & 7th floor general flooring work is in progress.lobby flooring work is in progress.• External plastering work is in progress.FLAT - 206,306,406,506,606,706 & 806FLAT - 207,307,407,507,607,707 & 807FLAT - 208,308,408,508,608,708 & 808FLAT - 209,309,409,509,609,709 & 809FLAT - 210,310,410,510,610,710 & 810FLAT - 211,311,411,511,611,711 & 811FLAT - 212,312,412,512,612,712 & 812FLAT - 313,413,513,613,713 & 813FLAT - 214,314,414,514,614,714 & 814FLAT - 215,315,415,515,615,715 & 815FLAT - 216,316,416,516,616,716 & 816FLAT - 217,317,417,517,617,717 & 817FLAT - 218,318,418,518,618,718 & 818FLAT - 219,319,419,519,619,719 & 819FLAT - 220,320,420,520,620,720 & 820FLAT - 221,321,421,521,621,721 & 821FLAT - 222,322,422,522,622,722 & 822FLAT - 223,323,423,523,723 & 823FLAT - 224,324,424,524,724 & 824 FLAT-213SECOND-FLOOR-PLAN THIRD-FLOOR-PLANFOURTH-FLOOR-PLAN

Building Permit :CEBA/WDCN14/00253/ 2016 dated 05.10.2016

Planning Permit : C/PP/ MSB/28(A TO N)/ 2016 dated  12.05.16

GO (Ms) No.62, dated 29.02.2016 and CMDA file No. C3(N)/8421/2015, dated 18.01.2016.

TNRERA/01/Building/0158/2017

Floor Plans

Availability

2ND FLOOR

RAMANIYAM MAGNUM

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 101 1 1475
2 102 1 1174
3 103 1 1174
4 104 1 1043
5 105 1 1385
6 106 1 1151
7 107 1 1745
8 108 1 1090
9 109 1 2294
10 110 1 1182
11 111 1 1397
12 112 1 1057
13 113 1 1169
14 114 1 1387
15 115 1 1454
16 116 1 1473
17 117 1 1201
18 118 1 1201
19 119 1 1103
20 120 1 1348
21 121 1 1353
22 122 1 1200
23 123 1 1398
24 124 1 1059
25 125 1 1171
26 126 1 1406
27 127 1 1420

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 201 2 1475
2 202 2 1174
3 203 2 1174
4 204 2 1043
5 205 2 1385
6 206 2 1151
7 207 3 1745
8 208 2 1090
9 209 2 2294
10 210 2 1182
11 211 2 1397
12 212 2 1057
13 213 2 1167
14 214 2 1385
15 215 2 1454
16 216 2 2313
17 217 2 1201
18 218 2 1201
19 219 2 1103
20 220 2 1348
21 221 2 1353
22 222 2 1200
23 223 2 1398
24 224 2 1059
25 225 2 1171
26 226 2 1406
27 227 2 2470

3RD FLOOR

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 301 3 1475
2 302 3 1174
3 303 3 1174
4 304 3 1043
5 305 3 1385
6 306 3 1151
7 307 3 1745
8 308 3 1090
9 309 3 2294
10 310 3 1182
11 311 3 1397
12 312 3 1057
13 313 3 1167
14 314 3 1385
15 315 3 1454
16 316 3 2313
17 317 3 1201
18 318 3 1201
19 319 3 1103
20 320 3 1348
21 321 3 1353
22 322 3 1200
23 323 3 1398
24 324 3 1059
25 325 3 1171
26 326 3 1406
27 327 3 2470

4TH FLOOR

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 401 4 1475
2 402 4 1174
3 403 4 1174
4 404 4 1043
5 405 4 1385
6 406 4 1151
7 407 4 1745
8 408 4 1090
9 409 4 2294
10 410 4 1182
11 411 4 1397
12 412 4 1057
13 413 4 1167
14 414 4 1385
15 415 4 1454
16 416 4 2313
17 417 4 1201
18 418 4 1201
19 419 4 1103
20 420 4 1348
21 421 4 1353
22 422 4 1200
23 423 4 1398
24 424 4 1059
25 425 4 1171
26 426 4 1406
27 427 4 2470

5TH FLOOR

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 501 5 1475
2 502 5 1174
3 503 5 1174
4 504 5 1043
5 505 5 1385
6 506 5 1151
7 507 5 1745
8 508 5 1090
9 509 5 2294
10 510 5 1182
11 511 5 1397
12 512 5 1057
13 513 5 1167
14 514 5 1385
15 515 5 1454
16 516 5 2313
17 517 5 1201
18 518 5 1201
19 519 5 1103
20 520 5 1348
21 521 5 1353
22 522 5 1200
23 523 5 1398
24 524 5 1059
25 525 5 1171
26 526 5 1406
27 527 5 2470

6TH FLOOR

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 601 6 1475
2 602 6 1174
3 603 6 1174
4 604 6 1043
5 605 6 1385
6 606 6 1151
7 607 6 1745
8 608 6 1090
9 609 6 2294
10 610 6 1182
11 611 6 1397
12 612 6 1057
13 613 6 1167
14 614 6 1385
15 615 6 1454
16 616 6 2313
17 617 6 1201
18 618 6 1201
19 619 6 1103
20 620 6 1348
21 621 6 1353
22 622 6 1200
23 623 6 1408
24 624 6 1068
25 625 6 1171
26 626 6 1406
27 627 6 2470
28 628 6 2586

7TH FLOOR

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 701 7 1475
2 702 7 1174
3 703 7 1174
4 704 7 1043
5 705 7 1385
6 706 7 1151
7 707 7 1745
8 708 7 1090
9 709 7 2294
10 710 7 1182
11 711 7 1397
12 712 7 1057
13 713 7 1167
14 714 7 1385
15 715 7 1454
16 716 7 2313
17 717 7 1201
18 718 7 1201
19 719 7 1103
20 720 7 1348
21 721 7 1353
22 722 7 1200
23 723 7 1398
24 724 7 1059
25 725 7 1171
26 726 7 1406
27 727 6 2470
28 728 7 2417

8TH FLOOR

SL.NO.

FLAT NO.

FLOOR NO.

AREA

1 801 8 1475
2 802 8 1174
3 803 8 1174
4 804 8 1043
5 805 8 1385
6 806 8 1151
7 807 8 1745
8 808 8 1090
9 809 8 2294
10 810 8 1182
11 811 8 1397
12 812 8 1057
13 813 8 1167
14 814 8 1385
15 815 8 1454
16 816 8 2313
17 817 8 1201
18 818 8 1201
19 819 8 1103
20 820 8 1348
21 821 8 1353
22 822 8 1200
23 823 8 1398
24 824 8 1059
25 825 8 1171
26 826 8 1406
27 827 8 2470
28 828 8 2417

Construction Specifications

The flats proposed in the building complex is to be constructed to this specification subject to minor changes in dimension, locations found desirable or necessary to ensure sound engineering practice at the sole discretion of the Builder.

  • R.C.C framed structure with porotherm brick walls.
  • 2’ X 2’ vitrified tile flooring.
  • Toilet and Balcony flooring with anti-skid tiles.
  • Main door with teak wood frame and imported solid wood door with melamine finish.
  • Solid wood frames and imported solid wood doors for bedrooms and bathrooms with painted finish.
  • UPVC windows – Fenesta/equivalent.
  • Door fittings will be of DORMA make.
  • Single lever divertor system will be provided in bathroom shower areas.
  • CP fittings of Jaguar/equivalent make.
  • Sanitary fittings of Parryware/equivalent make.
  • Copper wiring – Finolex/equivalent make.
  • Electrical switches – Anchor/MK/Equivalent.
  • Required number of lifts. Dedicated service lift.
  • Lifts – Kone/equivalent.
  • Sewage treatment plant will be provided.
  • Genset backup for all common areas and flats.
  • Periphery of the building will be suitably landscaped.
  • Fire fighting system in common areas.
  • Individual letter boxes at the lobby area.
  • Concealed PVC pipes for TV and telephone.
  • Common area shall be suitably paved and landscaped.
  • Security personnel/Servant’s/Driver’s toilet.
  • Rainwater harvesting.
  • Chimney provision.
  • Intercom facility between security and flats.
  • Security cabin.
  • Air conditioned Multipurpose hall and Theatre.
  • Air conditioned furnished Gymnasium.
  • Air conditioned Association room.
  • Swimming pool with changing rooms and toilets.
  • Badminton court.
  • Garbage chute.
  • CCTV/Access control.

Project Status

Project Status as on 8th Oct 2018

  • 2nd, 3rd, 4th 5th 6th & 7th floor inner wall plastering work is completed.
  • 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd, 4th, 5th 6th, 7th floor putty work is in progress.
  • 2nd, 3rd, 4th, 5th, 6th & 7th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th, 6th & 7th floor general flooring work is in progress.
  • Staircase and lobby flooring work is in progress.
  • External plastering work is in progress.
  • Texture painting work is in progress (swimming pool portion)
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Swimming pool work is in progress.
  • External trench work is in progress.
  • Ready to visit Model flat

Project Status as on 24th Sep 2018

  • 2nd, 3rd, 4th 5th 6th & 7th floor inner wall plastering work is completed.
  • 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd, 4th, 5th 6th, 7th floor putty work is in progress.
  • 2nd, 3rd, 4th, 5th, 6th & 7th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th, 6th & 7th floor general flooring work is in progress.
  • Staircase and lobby flooring work is in progress.
  • External plastering work is in progress.
  • Texture painting work is in progress (swimming pool portion)
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Swimming pool work is in progress.
  • External trench work is in progress.
  • Ready to visit Model flat

Project Status as on 17th Sep 2018

  • 2nd, 3rd, 4th 5th 6th & 7th floor inner wall plastering work is completed.
  • 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd, 4th, 5th 6th, 7th floor putty work is in progress.
  • 2nd, 3rd, 4th, 5th and 6th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th and 6th floor general flooring work is in progress.
  • Staircase and lobby flooring work is in progress.
  • External plastering work is in progress.
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Swimming pool work is in progress.
  • Ready to visit Model flat

Project Status as on 10th Sep 2018

  • 2nd, 3rd, 4th 5th 6th & 7th floor inner wall plastering work is completed.
  • 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd, 4th, 5th 6th, 7th floor putty work is in progress.
  • 2nd, 3rd, 4th, 5th and 6th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th and 6th floor general flooring work is in progress.
  • Staircase and lobby flooring work is in progress.
  • External plastering work is in progress.
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Swimming pool work is in progress.
  • Ready to visit Model flat.

Project Status as on 3rd Sep 2018

  • 2nd, 3rd, 4th 5th 6th & 7th floor inner wall plastering work is completed.
  • 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd, 4th, 5th 6th, 7th floor putty work is in progress.
  • 2nd, 3rd, 4th and 6th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th and 6th floor general flooring work is in progress.
  • Staircase and lobby flooring work is in progress.
  • External plastering work is in progress.
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Swimming pool work is in progress.
  • Ready to visit Model flat

Project Status as on 27th Aug 2018

  • 2nd, 3rd, 4th 5th & 6th floor inner wall plastering work is completed.
  • 7th, 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd, 4th, 5th 6th floor putty work is in progress.
  • 2nd, 3rd, 4th and 6th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th and 6th floor general flooring work is in progress.
  • Staircase and lobby flooring work is in progress.
  • External plastering work is in progress.
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Swimming pool work is in progress.
  • Ready to visit Model flat.

Project Status as on 20th Aug 2018

  • All floor brick work is completed.
  • 2nd, 3rd, 4th & 6th floor inner wall plastering work is completed.
  • 5th, 7th, 8th and 9th floor inner wall plastering work is in progress.
  • 2nd, 3rd floor 1st coat putty work is completed.
  • 4th, 5th floor 1st coat putty work is in progress.
  • 2nd floor – Second coats putty work is in progress.
  • 2nd, 3rd, 4th and 6th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th and 6th floor general flooring work is in progress.
  • Staircase flooring work is in progress.
  • External plastering work is in progress.
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Ready to visit Model flat.

Project Status as on 13th Aug 2018

  • All floor brick work is completed.
  • 2nd, 3rd, 4th & 6th floor inner plastering work is completed.
  • 5th, 7th, 8th and 9th floor inner plastering work is in progress.
  • 2nd, 3rd floor 1st coat putty work is completed.
  • 4th, 5th floor 1st coat putty work is in progress.
  • 2nd floor – Second coats putty work is in progress.
  • 2nd, 3rd, 4th and 6th floor toilet wall tile laying work is in progress.
  • 2nd, 3rd, 5th and 6th floor general flooring work is in progress.
  • External plastering work is in progress.
  • Compound wall work is in progress.
  • Terrace floor weathering course work is in progress.
  • Ready to visit Model flat

Swimming Pool
Gymnasium
Association Hall
Rainwater Harvesting
Elevators
Waste Water Treatment
Indoor Games
Power Backup
Multipurpose Hall
Recreation Room
Theater
Aerobics / Meditation Rooms
Snooker Room
Table Tennis
Double Height Lobby
Common Toilet
Driver Restroom
Badminton Court
Landscaped Walking Track
Landscaped Seating Area

Enquire Now

Compare properties

Similar Listings

Available

Ramaniyam Jaganath

1,796 ft2 upwards
Spacious and well ventilated apartments with amenities aplenty.
Spacious and well ventilated apartments with amenities aplenty. ...
Palavakkam
Available

Ramaniyam Guruprasad

1,177 ft2 upwards
Spacious and well ventilated apartments in Adyar.
Spacious and well ventilated apartments in Adyar. ...
Adyar
Available

Kamarajar Avenue

2,180 ft2 upwards
Spacious and well ventilated apartments with amenities aplenty.
Spacious and well ventilated apartments with amenities aplenty. ...
Adyar