All floor wall putty 1st coat is in progress.All floor wall putty 1st coat is in progress.All floor wall putty 1st coat is in progress.All floor wall putty 1st coat is in progress.All floor wall putty 1st coat is in progress.Site front viewStaircase area wall plasteringStaircase wall plasteringToilet plumbing concealed line work is in progressToilet plumbing concealed line work is in progressExternal plastering all side is in progress.External plastering all side is in progress.Head room brick and ceiling plastering work is completed.Plumbing water line concealed work is in progress.All floor wall putty 1stcoatis in progress.All floor wall putty 1stcoatis in progress.Plumbing water line concealed work is in progress.3rd floor brick and wall plastering work is completed (Alteration work).All floor wall putty 1stcoatis in progress.All floor wall putty 1stcoatis in progressAll floor wall putty 1stcoatis in progress.Plumbing water line concealed work is in progress.

..

Floor Plans

Availability

Block 1

Floor Flat / Section Area (Sq. Ft.) Availability No of Bedrooms
Floor 1  1A  1985  SOLD OUT  Triple
Floor 2  2A  1985  SOLD OUT  Triple
Floor 3  3A  1985  AVAILABLE  Triple

Project Status

Project Status as on 9th December 2017

  • All floor brick work is completed.
  • 2ndfloor inner wall plastering work is completed.
  • 3rd floor electrical wall chasing work is completed (Alteration work).
  • 3rd floor brick and wall plastering work is completed (Alteration work).
  • Head room brick and ceiling plastering work is completed.
  • All floor wall putty 1stcoatis in progress.
  • External plastering all side is in progress.

Project Status as on 02nd December 2017

  • All floor brick work is completed.
  • 2ndfloor inner wall plastering work is completed.
  • 3rd floor electrical wall chasing work is completed (Alteration work).
  • 3rd floor brick and wall plastering work is completed (Alteration work).
  • Head room brick and ceiling plastering work is completed.
  • All floor wall putty 1st coat is in progress.
  • External plastering all side is in progress.

Project Status as on 25th November 2017

  • All floor brick work is completed.
  • 2ndfloor inner wall plastering work is completed.
  • 3rd floor electrical wall chasing work is in progress (Alteration work).
  • 3rd floor brick and wall plastering work is in progress (Alteration work).
  • Head room brick and ceiling plastering work is completed.
  • All floor wall putty 1stcoatis in progress.
  • 1st and 2nd floor toilet plumbing concealed pipe line work is completed

Project Status as on 18th November 2017

  • All floor brick work is completed.
  • 2nd floor inner wall plastering work is completed.
  • 3rd floor door frame fixing work is completed.
  • External plastering work is in progress.
  • 1st floor wall putty work is in progress.
  • 1st and 2nd floor toilet plumbing concealed pipe line work is completed

Project Status as on 10th November 2017

  • All floor roof concrete work is completed.
  • All floor brick work is completed.
  • 3rd floor ceiling plastering work is completed.
  • 1st floor inner wall plastering work is completed.
  • 2ndfloor inner wall plastering work is in progress

Project Status as on 6th November 2017

  • All floor roof concrete work is completed.
  • 1st floor brick work is completed.
  • 2nd and 3rdfloor above lintel level brick work is in progress.
  • 3rd floor ceiling plastering work is in progress.
  • 1st floor inner wall plastering work is in progress

Project Status as on 28th October 2017

  • All floor roof concrete work is completed.
  • 1st floor brick work is completed.
  • 2nd and 3rdupto lintel level brick work is completed.
  • Terrace parapet wall brick work is completed

Project Status as on 21st October 2017

  • All floor roof concrete work is completed.
  • 1st floor brick work is 90% completed.
  • 2nd and 3rd upto lintel level brick work is in progress.
  • Terrace parapet wall brick work is in progress

Project Status as on 14th October 2017

  • 3rd floor roof concrete work is completed.
  • All floor brick work is in progress.
  • Head room & lift cover slab concrete work is completed

Construction Specifications

CONSTRUCTION  SPECIFICATIONS

 

Bedrooms:
No. Of Units: 6
Rainwater Harvesting
Elevators
Power Backup

Enquire Now

Compare properties

Similar Listings

Available

Magnum

Exclusive residential apartments which will embrace your fine living.
Exclusive residential apartments which will embrace your fine living. ...
Tharamani
Available

Mugalivakkam

Spacious and well ventilated apartments in Mugalivakkam.
Spacious and well ventilated apartments in Mugalivakkam. ...
Mugalivakkam
Available

Krishna

Spacious and well ventilated apartments in Thiruvanmiyur.
Spacious and well ventilated apartments in Thiruvanmiyur. ...
Thiruvanmiyur