1st& 2nd floor wall putty first coat is completed.1st & 2nd Floor Toilet wall tile laying work is completed.1st & 2nd Floor Toilet wall tile laying work is completed.1st& 2nd general floor tile laying work is in progress1st& 2nd general floor tile laying work is in progress1st& 2nd general floor tile laying work is in progress1st& 2nd general floor tile laying work is in progress1st & 2nd floor wall putty first coat is completed1st & 2nd floor wall putty first coat is completed1st & 2nd floor wall putty first coat is completedSite side viewExternal plastering work is in progress.External plastering work is in progress.1st& 2nd floor wall putty first coat is completed.1st& 2nd floor wall putty first coat is completed.1st& 2nd floor wall putty first coat is completed1st& 2nd floor wall putty first coat is completed.1st& 2nd floor wall putty first coat is completed.1st& 2nd floor wall putty first coat is completed.1st& 2nd floor wall putty first coat is completed.Terrace parapet wall plastering work is completedTerrace parapet wall plastering work is completedOHT Plastering work is in progress.1st& 2nd floor wall putty first coat is completed.

Project comprising of Stilt + 2 floors, consisting of 4 flats,  admeasuring 948 Sq.ft.

Building Permit No:BA / WDCN13 /00861 / 2017 dated  20.02.2017 

Planning permit No   : PPA / WDCN13/ 06043 / 2016 dated 20.02.2017

Floor Plans

Availability

Floor Flat / Section Area (Sq. Ft.) Availability
Floor 1  1A  947  SOLD OUT
 1B  948  AVAILABLE
Floor 2  2A  947  SOLD OUT
 2B  948   AVAILABLE

Project Status

Project Status as on 9th December 2017

  • Head room roof concrete work is completed.
  • External plastering work is in progress.
  • 1st & 2nd Floor Toilet wall tile laying work is completed.
  • 1st& 2nd general floor tile laying work is in progress.
  • 1st& 2nd floor wall putty first coat is completed.

Project Status as on 02nd December 2017

  • Head room roof concrete work is completed.
  • External plastering work is in progress.
  • 1st& 2nd general floor tile laying work is in progress.
  • 1st& 2nd floor wall putty first coat is completed.

Project Status as on 25th November 2017

  • Head room roof concrete work is completed.
  • External plastering work is in progress.
  • 1st& 2nd Toilet plumbing work is in progress.
  • 1st and 2nd floor toilet water proofing work is completed.
  • 1st& 2nd floor ceiling primer painting work is completed

Project Status as on 18th November 2017

  • Head room roof concrete work is completed.
  • Terrace parapet wall plastering work is in progress.
  • External plastering work is in progress.
  • 1st& 2nd Toilet plumbing work is in progress.
  • 1st and 2nd floor toilet water proofing work is completed.
  • 1st & 2nd floor ceiling primer painting work is completed

Project Status as on 10th November 2017

  • Head room roof concrete work is completed.
  • 1st floor wall plastering work is completed.
  • 2nd floor wall plastering work is completed.
  • Terrace parapet wall plastering work is in progress.
  • External plastering work is in progress.
  • OHT RCC wall work is completed.
  • 1st& 2nd Toilet plumbing work is in progress

Project Status as on 6th November 2017

  • Head room roof concrete work is completed.
  • 1st floor wall plastering work is completed.
  • 2nd floor wall plastering work is in progress.
  • Terrace parapet wall plastering work is in progress.
  • External plastering work is in progress.
  • OHT RCC wall work is completed.
  • 1st& 2nd Toilet plumbing work is in progress

Project Status as on 28th October 2017

  • Head room roof concrete work is completed.
  • 1st floor wall plastering work is completed.
  • 2nd floor wall plastering work is in progress.
  • Terrace parapet wall plastering work is in progress.
  • External plastering work is in progress.
  • OHT RCC wall work is in progress.
  • 1st& 2nd Toilet plumbing work is in progress

Project Status as on 21st October 2017

  • Head room roof concrete work is completed.
  • 1st floor wall plastering work is in progress.
  • 2nd floor electrical wall chasing is in progress.
  • Terrace parapet wall plastering work is in progress.
  • External plastering work is in progress.
  • OHT RCC  wall work is in progress

Project Status as on 14th October 2017

  • Head room roof concrete work is completed.
  • 1st floor wall plastering work is in progress.
  • 2nd floor electrical wall chasing is in progress.
  • Terrace parapet wall plastering work is in progress.
  • OHT RCC  wall work is in progress.

Construction Specifications

        CONSTRUCTION SPECIFICATIONS

 

  1. The flat is to be constructed to this specification subject to minor changes in dimension, locations found desirable or necessary to ensure sound engineering practice at the sole discretion of the Builder. The specifications detailed in this agreement shall be final and any changes in specifications from the brochure to this agreement are made for the benefit of the project with clear understanding of the contracting party.

 

  1. TYPE OF CONSTRUCTION

 

2.1     RCC framed structure with non-load bearing, brick and cement mortar walls or Cellular light weight concrete (CLC) block walls.

2.2     Ceiling height will be 10 feet approximately, except in the toilets where it will be 9 feet 3 inches.

2.3     Generally internal partition walls will be 4.5 inches and outer walls will be 9 inches / 6 inches.

 

  1. WALL FINISH

 

3.1     Walls will generally be plastered and painted inside and outside.

3.2     In the toilets, wall will be covered with kajaria ceramic tiles upto 7 feet.

3.3     In the wash area, tiles will be provided upto the height of 3 feet.

3.4     Ceramic tiles will be plain/flower series.

 

  1. FLOORING

4.1     Flooring will be vitrified tiles 2′ X 2′ for living, dinging, bedrooms, kitchen areas.   Balconies and was areas shall be provided with 12 x 12 ceramic tiles.

  1. DOORS

5.1     Main door frame and other door frames shall be of good quality wood fitted with flush doors. Main door will be of varnished finish and other doors will be painted on both sides.

5.2     All Door fittings will be of anodised aluminium – Jothi Brand / equivalent.

5.3     Main door will be provided with secure lock, one aldrop, safety chain and peep hole.

5.4     Doors to the bedrooms will be provided with secure locks and door to the kitchen will be provided with aldrops.

  1. WINDOWS AND VENTILATORS

6.1     Pre fabricated fenesta / aluminium windows will be provided.

6.2     Ventilators will be of good quality wooden frames with glass louvers.

6.3     Split A/c provision will be provided in all bedrooms.

  1. KITCHEN

7.1     G 20 Black Granite slab will be provided for the kitchen cooking platform.

7.2     A single bowl stainless steel sink with drain board will be provided.

 

  1. PLUMBING AND SANITARY FITTINGS

8.1     Concealed plumbing lines from the overhead tank for each floor.

8.2     All closets and wash basins will be in white colour.

8.3     Provision in plumbing for connecting one geyser in each toilet.

8.4     Hot and cold mixers for shower and shower tap in each toilet.

8.5     Toilet closets will be floor / wall mounted EWC shall be provided as desired by the Contracting Party.

8.6     Bathroom fittings – Jaquar Continental range.

 

9.0     WATER SUPPLY

9.1     One common bore well and metro water sump will be provided.

9.2     Two pumps one for bore and one for sump will be provided.

9.3     Common overhead tank shall be provided.

 

10.0   ELECTRICAL

10.1    Concealed copper wiring with Finolex cables and MK switches/equivalent make will be provided.

10.2    Separate meter for lighting in common areas, the lift and pumps.

10.3    Three phase power supply with automatic phase change over switches will be provided.

10.4    15 AMP power plug sockets will be provided for water heater in the toilet, for air conditioners in the bedrooms two in the kitchen and in the service balcony for washing machine.

10.5    In all the flats 5 AMP Multiple Sockets will be provided in the kitchen, one for aquaguard, one for mixer machine, exhaust fan, Microwave Oven, Grinder & Fridge shall be provided.

10.6    Two 5 AMP Multiple plug sockets will be provided in each room except that in the living room in addition a multiple socket with 3 outlets will be provided for connection to TV, stereo and VCR.

10.7    One calling bell point will be provided.

10.8    Except for the light points in the staircase, all other light and fan points will be controlled from single point.

11.0   OTHERS

11.1    One common name board and letter boxes for each flat built to design will be provided at the entrance to the building.

11.2    Concealed PVC pipes for TV antenna will be provided in the living room and bed rooms.

11.3    A common board will be provided near the entrance to the building for incoming telephone line, with provision for concealed wiring from this board to one in the living room and each one in the bed rooms and study rooms.

11.4    The common area outside the building shall be paved and suitably landscaped.

 

The Builder reserves the right to make alterations, which may be necessary due to technical and aesthetic reasons.

Bedrooms:
Unit Size: 948 sqft
Floors: 2
No. Of Units: 4

Enquire Now

Compare properties

Similar Listings

Available

Magnum

Exclusive residential apartments which will embrace your fine living.
Exclusive residential apartments which will embrace your fine living. ...
Tharamani
Available

Mugalivakkam

Spacious and well ventilated apartments in Mugalivakkam.
Spacious and well ventilated apartments in Mugalivakkam. ...
Mugalivakkam
Available

Krishna

Spacious and well ventilated apartments in Thiruvanmiyur.
Spacious and well ventilated apartments in Thiruvanmiyur. ...
Thiruvanmiyur